Planning Scheduling and Cost Control using Primavera 6

The objective of this training course is to introduce the participants to Primavera 6® software for successful project management. It examines how to use primavera for project planning, scheduling, and control. The course give background in the concept of project management processes & Scheduling techniques will be covered

 

 

Course Outline:

Day One

  • Introduction to Primavera
  • Primavera 6 Setup
  • Project Management life cycle
  • Network planning
  • Critical path method (CPM)
  • Schedule calculations
  • Navigation
  • Setting up the Enterprise Project Structure (EPS)
  • Setting up the Organizational breakdown Structure (OBS)
  • Creating a new Project
  • Work breakdown structure (WBS)
  • Creating WBS Hierarchy
  • Adding WBS Elements and Assigning Properties

 

Day Two

  • Working with Activities
  • Activity Types
  • Adding Activities
  • Establishing Relationships
  • Project Scheduling
  • Constraints Types
  • Working with Calendars
  • Working with Calendars (Global, Project)
  • Create new project Calendars
  • Establishing Activity Codes
  • Creating Activity Codes and Values
  • Assigning Codes to activities

 

Day Three

  • Maintaining a Project’s Document Library
  • Adding/Deleting Work Products And Documents
  • Assigning Work Products and Documents To Activities
  • Working with Layouts
  • Creating, Opening, and Saving Layouts
  • Grouping, Sorting Data
  • Filtering Data
  • Customizing Layouts
  • Modifying Columns, Adjusting the Timescale, Formatting Gantt Charts
  • Produce bar chart reports
  • Produce schedule reports

 

Day Four

  • Defining Resources and Roles
  • Resources Overview
  • Viewing and Adding Resources
  • Working with Cost Accounts and Project Expenses
  • Setting Up a Cost Account Structure
  • Adding Expenses and Entering Cost Information
  • Analyzing Resources and Costs
  • Producing Resource Usage Profile
  • Producing Resource Usage spreadsheet

 

Day Five

  • Updating process
  • Managing Baselines
  • Creating and Maintaining Baselines
  • Assigning Baselines to Projects
  • Updating
  • Choosing a Method of Updating
  • Record project progress
  • Scheduling Projects
  • Current vs. Baseline comparison report

 

Sequence of Training

  • The sequence for this training will be as follows;
  • We will consider the real BOQ of a project.
  • After brief introduction to P6 layout, we will add activities list.
  • Next, we will define and assign calendars and thus learning the function of global change.
  • Then we will link activities and will schedule our project.
  • After Scheduling, we will add resources/cost and optimize our resourced schedule plan and will maintain S-Curve.
  • The we will learn how to create reports.
  • Next to reports, we will update our project as per actuals.
  • At the end, we will create a comparison report i.e. Planned Vs Actual “Cost and Schedule Wise”.

 

Registration 

From KSA
 Mobile:  +966 (0) 53 879 58 37
               +966 (0) 53 879 58 39

 From UAE
 Tel:     +971 (4) 29 40 902 Ext. (102),
 Mob:   +971 55 399 0647
 Fax:    +971 (4) 29 40 903
 
 From Egypt
 Tel:        +2 02 39 12 4970 
 Mobile:  +2 0122 141 9650 
               +2 0111 988 23 59
   
  This email address is being protected from spambots. You need JavaScript enabled to view it.

 

 

Planning Scheduling and Cost Control using Primavera 6 

 

 

 

 

Accreditations

  • PMI
  • API
  • ASME
  • NEBOSH
  • IOSH
  • HRCI
  • SHRM
  • Oracle
  • MicroSoft
  • IRCA
  • AICI
  • STS
  • PECB

 

 

Contact Us

 +2 010 10 725 111

ICE Contacts

 

        

 

        

 

JoomShaper